Non-Field Work Performed Since the Last RAB Meeting

Area 303

The Navy developed a focused feasibility study report for this site.  Discussions are on-going between ADEC and the Navy concerning the results.

 

 

Pipeline Decommissioning

The Navy is evaluating contractor bid packages for work planned during the 2009 field season.

 

 

EE/CA Documentation

The Navy began developing an engineering evaluation\cost analysis for the Former Power Plant, T-1451 and SWMU61, Tank Farm B.  This work begins to address recommendations from the 2006 Annual Groundwater Monitoring Report concerning these two sites.

 

 

Non-Field Work Planned Before The Next RAB Meeting

Area 303

·         Continue discussions between ADEC and the Navy concerning the preferred remedy for this site.

·         Develop the proposed plan for this site if discussions between ADEC and the Navy on the subject conclude.

 

 

Pipeline Decommissioning

Select a contractor to complete the work for the 2009 field season.

 

 

EE/CA Documentation

Complete the EE\CA and develop a remedial design work plan for any additional work, as warranted

 

 

Antenna Field Site

Plan for additional site characterization based on results of the 2006 Petroleum Summary Report