Petroleum Sites Update
Prepared for the Tuesday,
September 9, 2008
Prepared by Navy – Gary Simmons and Mark Wicklein
Non-Field
Work Performed Since the Last RAB Meeting
Area 303
The Navy
developed a focused feasibility study report for this site. Discussions are on-going between ADEC and the
Navy concerning the results.
Pipeline Decommissioning
The Navy is
evaluating contractor bid packages for work planned during the 2009 field
season.
EE/CA Documentation
The Navy
began developing an engineering evaluation\cost analysis for the Former Power
Plant, T-1451 and SWMU61, Tank Farm B.
This work begins to address recommendations from the 2006 Annual
Groundwater Monitoring Report concerning these two sites.
Non-Field Work Planned Before The Next RAB Meeting
Area 303
·
Continue
discussions between ADEC and the Navy concerning the preferred remedy for this
site.
·
Develop
the proposed plan for this site if discussions between ADEC and the Navy on the
subject conclude.
Pipeline Decommissioning
Select a
contractor to complete the work for the 2009 field season.
EE/CA Documentation
Complete the
EE\CA and develop a remedial design work plan for any additional work, as
warranted
Antenna
Field Site
Plan for additional site characterization
based on results of the 2006 Petroleum Summary Report